Road Closed For Sewer Installation Project

(From the City of Findlay)

CONSTRUCTION 9/15-9/19:

-Twp. Rd. 77 (Western Ave.) will be closed to all traffic in sections from Twp. Rd. 80 to Trail 81 for a sanitary sewer project.

-Western/Broad Ave. will be closed to through traffic from Main Cross St. to Howard St. for sewer installation. Detour will be posted.

-Beginning September 15, traffic patterns will be shifted on the bridge on S. Blanchard St. between E. Main Cross St. and Cross Ave. while the bridge is under construction. Two-way traffic is expected to be maintained during construction. Please use caution in this area.

Please call the Engineering Department with any questions (419) 424-7121.